国模吧无码一区二区三区_国产一卡2卡三卡4卡免费_自拍偷自拍亚洲精品播放_少妇被粗大的猛烈进出的免费视频

Company Overview

Home>Company Overview>Company Overview

SINCE2019

Longxingtai Energy Technology

Longxingtai Energy Technology Co., Ltd. was established on May 30, 2019. It is composed of Xuzhou Longshan Coking Co., Ltd., Xuzhou Dongxing Energy Co., Ltd., Xuzhou Zhongtai Energy Technology Co., Ltd., and Yizhou Technology Co., Ltd. The “Implementation Plan for Optimized, Transformation and Upgrade of the City’s Coking Industry Layout” requires the integration of established companies. The company's address is located in the Carbon-based New Material Industrial Park of Pizhou Economic Development Zone. The project is expected to have a total investment of 6.41 billion yuan and a planned land area of ??more than 1,300 acres.

Xuzhou Longxingtai Energy Co., Ltd. is currently in the construction period. The project adopts the most advanced international and domestic technology, and uses a 200,000-ton fully enclosed large silo for coal storage and distribution, which reduces land occupation and completely eliminates environmental dust pollution; construction The first large-scale CDQ storage warehouse in China has solved the problem of dust during the storage and transportation of CDQ coke; supporting the construction of 3 sets of CDQ systems to achieve full dry quenching by private independent coking enterprises, which not only reduces environmental pollution, but also uses waste heat to generate electricity. It solves the electricity needs of coking; the riser of the coke oven adopts waste heat recovery and utilization technology to generate steam, and the gas purification and desulfurization is equipped with an advanced dry acid production system, which not only solves the environmental protection problem, and its product concentrated sulfuric acid can also be used as a raw material for ammonium sulfate production. ; The project also builds a coking wastewater advanced treatment and reuse system, all wastewater is not discharged, and the reuse rate is high. The level of environmental protection, safety and automation configuration of this project leads the country.

After the project is completed, it can produce 2.6 million tons of metallurgical coke, 300,000 tons of methanol, and 100,000 tons of liquid ammonia. The company’s waste heat and energy generate 400 million kilowatt-hours of electricity annually, can achieve sales revenue of 10 billion, tax revenue of 500 to 1 billion, and can place more than 1,000 employees.

2019

year
Longxingtai was established

1300

acres
Estimated planning land

64

billion yuan
Estimated total investment

2.6

million tons
Metallurgical coke

300,000

tons
Methanol

100,000

tons
Liquid ammonia
Leader's Message

In the new era of high-quality development, Xuzhou Longxingtai was born on the new journey of sailing. May 30, 2019 is destined to be a day worth remembering.

"Gou Rixin, Day by Day, and Day by Day", today's Long Xingtai, with the strong support of the Xuzhou and Pizhou governments, and with the help of friends from all walks of life, the enterprise under construction is showing a brilliant picture of rapid change, nurturing With great hope of epoch-making.

The coexistence of opportunities and challenges to achieve tomorrow's great cause requires the hard work of cadres and employees and the strong support of friends from all walks of life. "Riding the wind and breaking the waves, we will hang the clouds and sail to the sea", let us work together, work hard, overcome difficulties, and build a safe, environmentally friendly, smart and efficient new energy technology benchmark enterprise!

乾安县| 宝鸡市| 包头市| 津市市| 类乌齐县| 杭锦后旗| 巨野县| 南川市| 子长县| 新乡县| 罗定市| 资中县| 罗定市| 且末县| 黎城县| 偏关县| 双城市| 普格县| 五常市| 西城区| 南城县| 杨浦区| 任丘市| 乌兰察布市| 永清县| 龙海市| 连城县| 五大连池市| 驻马店市| 台南县| 宜宾市| 常山县| 衢州市| 保定市| 长寿区| 墨脱县| 东海县| 洛浦县| 华池县| 鸡东县| 乌兰县|